车间仓库通常采用什么种类的地坪?

作者:kiki 来源:未知 日期:2017/11/1 11:10:09 人气: 标签:
导读:现代企业,如果有工厂都会选择做地坪,同时,也是客户所关注的问题。但是,对于工厂的地坪怎么做好这个是客户首先想要解决的问题。Modern enterprises, if any f

现代企业,如果有工厂都会选择做地坪,同时, 也是客户所关注的问题。但是,对于工厂的地坪怎么做好这个是客户首先想要解决的问题    

Modern enterprises, if any factories choose to make floor, at the same time, are also the concerns of customers. However, how to do this for the factory floor is the first problem that customers want to solve. 

工厂做硬化地坪

The factory is making hardened floors

  相对于一般企业来说,工厂做硬化地坪是比较好的选择,这种方法是直接在混凝土地面上进行硬化处理,工艺简单,工期短。同时,工厂做硬化地坪的价格比较实惠,而且满足工业场合的耐磨、防尘、抗压等需求,清洁起来的时候比较方便,没有维护成本费用

   Compared with the general enterprise, it is a good choice for the factory to make the hardened ground floor. This method is directly hardened on the concrete floor. The process is simple and the duration is short. At the same time, the price of the factory to harden the ground floor is relatively affordable, and meet the demand of wear-resisting, dustproof, and anti-pressure in the industrial situation, it is convenient to clean up, there is no maintenance cost.

工厂做金刚砂硬化地坪

The factory made the emery sand

  针对于重工业企业或者是对地面耐磨需求较高的企业,我们可以选择为工厂做金刚砂硬化地坪。就是指在混凝土初凝期做好金刚砂地坪后进行养护28天,之后在进行硬化施工。这种方法做出来的地坪更加美观耐磨,然而施工工期较长,价格也比硬化地坪要高。

    Aiming at heavy industry enterprises or enterprises with high demand for abrasion of the ground, we can choose to make emery sand harden ground for factories. It is to point to the concrete initial setting period completes the emery floor after the maintenance 28 days, then in the hardening construction. This method makes the floor more beautiful and wear-resisting, but the construction period is longer and the price is higher than the hardened floor.